TRIP Window Replacement

Removal of existing window structures and the installation of new systems with state of the art glass. Terminals A, B and E at DFW International Airport.

image description

TRIP Terminal A Remodel

Involved relocating 45 jet bridges to accommodate new wide body aircraft with emphasis on the electrical, communications, structural steel, and concrete during 45 gate walkway refitting and relabeling. Terminals A & C at DFW International Airport.

image description

Aircraft Auto-docking Project

Aircraft Auto-docking project consisted of the design and installation of 92 Aircraft Visual Docking Guidance Systems (AVDGS) at Terminals A, B, C & D at DFW International Airport. This system allows for the docking of aircraft during inclement weather.

image description

Infrastructure Improvements

complete demolition of existing tramway and new construction of elevated concrete slab and security walls for future build out of concession space. New 3,400 sf addition of elevated concrete deck, with 2,200 sf of perimeter masonry wall. Steel bracing, painting and electrical build out included. Terminal A at DFW International Airport.

image description

Replacing Automatic Doors

Replacement of approximately 80 sliding entry doors throughout DFW International Airport with associated flooring and finish out. Worked around airport operations controlling exit and egress at all times.